¡BUY NOW!

Requirements and installation

In order to install the ECOWA Air Retention® valve, you must meet the following requirements:

Functional volumetric flow meter.
Periodic readings of your flow meter made by your water supplier.
Your water consumption must be above the minimum rate established by your water supplier.

The installation of the ECOWA valve is simple, as shown in the next diagram.

It’s important to follow these indications:

Install the valve horizontally.
Install the valve immediately after the water meter for better results.
A free water flow between the water meter and the valve is required; there shouldn’t be a valve check, filter or any other flow deviation (Tees).
Install following the flow arrow shown in the label.

Abrir chat
¿Te ayudo en algo?